TUMCREATE

Edit Template

Life Cycle Climate Change Impact of a Cost-Optimal HVDC Connection to Import Solar Energy from Australia to Singapore

Life cycle CO2 emissions of supplying Singapore with photovoltaic power from Australia via an HVDC connection

The chart shows the life cycle emissions of PV plant, battery installation and HVDC cable in gCO2e per kWh of electric energy delivered to Singapore.
Schema of Australia-Singapore HVDC connection
Cable length (km):
Full load hours: 
Electricity generation mix:
(PV and battery system manufacturing)

Scroll to Top